婷婷成人丁香五月综合激情,成人精品一区二区三区在线观看,东京热TOKYO综合久久精品,成人A级视频在线观看

您的瀏覽器版本過(guò)低,為保證更佳的瀏覽體驗,請點(diǎn)擊更新高版本瀏覽器

以后再說(shuō)X

歡迎訪(fǎng)問(wèn)瑞昌明盛自動(dòng)化設備有限公司網(wǎng)站!

圖片名

全國訂購熱線(xiàn):
+86 15270269218E-mail:xiamen2018@foxmail.com

主頁(yè) > 資訊公告 > 產(chǎn)品資訊

產(chǎn)品資訊
產(chǎn)品資訊 行業(yè)資訊 工控詢(xún)價(jià)

MAESTRO 60X7/14伺服驅動(dòng)模塊

作者:xqt 發(fā)布時(shí)間:2022-07-05 13:48:52 次瀏覽

MAESTRO 60X7/14伺服驅動(dòng)模塊,MINI使用尺寸過(guò)電壓保護電子關(guān)機電路可防止電壓超過(guò)6.2伏。備用電壓鉗是用于防止持續過(guò)電壓由外部影響或內部影響引起的條件故障。內部故障引起的過(guò)電壓可能導致保險絲斷開(kāi)。對于短期過(guò)電壓情況,當原因為遠離的。每個(gè)傳感器上都提供了電子電流限制三個(gè)輸出。任何輸出過(guò)載都會(huì )導致電壓崩潰,并可能導致其他輸出電壓崩潰。MAESTRO 60X7/14伺服驅動(dòng)模塊拆卸后將恢

MAESTRO 60X7/14伺服驅動(dòng)模塊,MINI使用尺寸

過(guò)電壓保護電子關(guān)機電路可防止電壓超過(guò)6.2伏。備用電壓鉗是用于防止持續過(guò)電壓由外部影響或內部影響引起的條件故障。內部故障引起的過(guò)電壓可能導致保險絲斷開(kāi)。對于短期過(guò)電壓情況,當原因為遠離的。每個(gè)傳感器上都提供了電子電流限制三個(gè)輸出。任何輸出過(guò)載都會(huì )導致電壓崩潰,并可能導致其他輸出電壓崩潰。

MAESTRO 60X714 -3.jpg

MAESTRO 60X714.jpg

MAESTRO 60X714 -2.jpg

MAESTRO 60X7/14伺服驅動(dòng)模塊拆卸后將恢復正常操作超載。在恢復正常運行之前,可能需要一些設備冷卻時(shí)間。雙機架操作一個(gè)電源可以為兩個(gè)人供電以下條件下的機架:

第二個(gè)機架只需要5伏電源,兩個(gè)機架所需的總功率與電源容量有關(guān)。第二個(gè)機架消耗的電流小于5.2安培。兩個(gè)機架必須緊密安裝受可用3英尺連接電纜的限制。用于雙機架操作的連接電纜為表1中列出了訂購信息。該電纜車(chē)包括+5伏電源總線(xiàn)和電源對信號進(jìn)行排序。它使用9針D型連接器它通過(guò)一個(gè)機架中的開(kāi)口。注意,電纜承載僅限功率和功率排序信號。機架間通信和總線(xiàn)接口模塊必須單獨提供。參見(jiàn)適用的可編程控制器安裝手冊。有關(guān)應用程序信息。系統重置。5VSTBY輸出可用于用戶(hù)電池備份方案如圖所示。通電時(shí),ACFAIL信號出錯5伏總線(xiàn)在規格范圍內后不久。SYSRESET將系統保持在重置狀態(tài)至少5伏電源可用后200毫秒(期間這一次,輸出被強制關(guān)閉)。如果交流輸入電源中斷,5伏總線(xiàn)將在規格范圍內重新供電至少一個(gè)周期。這個(gè)然后,在SYSRESET停止所有操作之前,給系統額外5毫秒的時(shí)間來(lái)完成有序關(guān)機處理。

Overvoltage Protection

An electronic shutdown circuit protects against voltages exceeding 6.2 volts. A back-up voltage clamp is

provided to protect against sustained overvoltage

conditions due to either external influences or internal

faults. Overvoltage due to internal faults may cause

the fuse to open. For short term overvoltage conditions, normal operation will resume when the cause is

removed.An electronic current limit is provided on each of the

three outputs. An overload on any output will cause

the voltage to collapse and may cause the other output voltages to collapse.

Normal operation will resume after removal of the

overload. Some component cooling time may be required before normal operation resumes.Dual Rack Operation

A single power supply can provide power for two

racks under the following conditions:

 Only 5 volt power is required in the second rack,

and the total power required by both racks is within the capability of the supply.

 The current drawn by the second rack is less than

5.2 amperes.

 The two racks must be mounted in close proximity

as limited by the available 3-foot connecting cable.

The connecting cable used for dual rack operation is

listed in Table 1, Ordering Information. This cable carries the +5 volts power bus as well as the power

sequencing signals. It uses a 9-pin D-type connector

which connects directly to the backplane through an

opening in the rack frame. Note that the cable carries

power and power sequencing signals only. Inter-rack

communication and bus interface modules must be provided separately. See the applicable Programmable

Controller Installation Manual. for application information.SYSRESET. The 5VSTBY output may be used for user

battery backup schemes as shown.

On application of power, the ACFAIL signal goes false

soon after the 5 volt bus is within specification. The system is held in the Reset state by SYSRESET for at least

200 milliseconds after 5 volt power is available (during

this time, outputs are forced off).


圖片名 客服

在線(xiàn)客服 客服一號